Tanner Williams Road
The Tanner Williams Road project expanded a two-mile corridor from two lanes to five, significantly improving safety, traffic flow, and accessibility. In support of Frank
OVERVIEW
APAC delivered the early civil package for the Alabama State Port Authority’s future 60-acre logistics park, laying the groundwork for enhanced intermodal connectivity and long-term economic growth. The project included mass haul excavation, installation of a 2,400-foot 84-inch concrete storm drain trunk line, intersection realignment to unify the site into a single parcel, and Cured-In-Place lining of a five-barrel 60-inch outfall discharging into Mobile Bay. At peak production, the project was supported by 20 APAC employees and 15 pieces of heavy equipment.

The Tanner Williams Road project expanded a two-mile corridor from two lanes to five, significantly improving safety, traffic flow, and accessibility. In support of Frank

APAC’s Montgomery crew completed critical paving work along the busy I-85 downtown corridor, one of Alabama’s most heavily traveled routes. This phase of the project

APAC Alabama is advancing Phases 2C and 2D of the Mobile International Airport terminal expansion, delivering extensive landside and airside civil improvements. The work includes